
MOOSE UTILITY Axle Kit - CV - Complete - Front Left/Right - Heavy-Duty - Polaris 2007 - POL-6025HD
SKU POL-6025HD
Sold out
Original price
$0
Original price
$363.95
-
Original price
$363.95
Original price
Current price
$363.95
$363.95
-
$363.95
Current price
$363.95
FREE Shipping Over $99*
- FREE Shipping on orders over $99 -Excludes Bulky Items
- All prices are in Australian Dollars
- See delivery info below
- Precision-machined and heat-treated solid chromoly steel center shaft, cages and ball bearings up to 35% stronger
- Highest quality, most reliable, and toughest constant-velocity (CV) axles on the market
- Induction heat-treated joints with premium heavy-duty, high-temperature moly grease
- Designed to withstand the most rigorous conditions and terrain
- Precision-rolled splines and threads improve fitment and wear
- TPE dust boots for superior tear and puncture resistance
- Torture-tested to failure to ensure maximum durability
- Exceeds OEM quality in fit, form and function
- Secure stainless steel dust boot clamps
- Fully assembled for easy installation
Fitment Guide
2007 | Polaris | Ranger 700 Commercial EFI 4x4 | - | - |
2007 | Polaris | Ranger XP 700 LE EFI 4x4 | - | - |
2007 | Polaris | Ranger XP 700 EFI 4x4 | - | - |
2007 | Polaris | Ranger 700 Commercial EFI 6x6 | - | - |
2007 | Polaris | Ranger 500 EFI 4x4 | - | - |
2007 | Polaris | Ranger XP 700 LE Browning Hunter Edition EFI 4x4 | - | - |
2007 | Polaris | Ranger 500 4x4 | - | - |
Specs
PRODUCT NAME | AXLE |
TYPE | COMPLETE / CV |
MOUNTING POSITION | FRONT LEFT / FRONT RIGHT |
BASE COLOR | BLACK |
FINISH | CHROME |
COLOR/FINISH | CHROME / BLACK |
MATERIAL | CHROMOLY STEEL |
DUTY | HEAVY-DUTY |
UNITS | KIT |
RIDING STYLE | UTV |
Delivery Info
Please Note - Warehouse Locations For This Part -
MOOSE UTILITY Axle Kit - CV - Complete - Front Left/Right - Heavy-Duty - Polaris 2007 - POL-6025HD
Gold Coast Warehouse- If your parts are in stock at our Gold Coast warehouse at the time of order, they will be shipped within 24hrs.
Supplier Warehouse - 2-3 Week Delivery- If your parts are located at our Supplier Warehouse, Delivery ETA is approx 2-3 weeks, as the parts are likely coming from our USA supplier warehouse. We will notify you once we receive it in Gold Coast warehouse and its on its way to you.